DEMOLITION COST
Estimate demolition work, then verify the proposal.
A useful demolition estimate should consider selective versus structural demo, debris volume, hazardous materials, utility disconnects, permits, access, hauling, and disposal fees.
What to check before signing a demolition proposal
- Exact scope boundaries, protection of remaining structure, utilities, dust control, hauling, and disposal.
- Permit responsibility and asbestos, lead, mold, or hazardous-material exclusions.
- Who handles patching, restoration, inspections, and cleanup.
- Unit prices for hidden conditions and extra disposal.